OUR PROJECTS
& MONITORING SUCCESSS STORIES
"Lil Mount Monitoring provided us with a full pre-construction survey in Vancouver’s downtown core. The report helped prevent major disputes with a neighboring property and saved us valuable time and money."
Home › Projects
Proven Monitoring Solutions Across Construction & Infrastructure
At Lil Mount Monitoring, every project is an opportunity to protect structures, ensure compliance, and deliver peace of mind. From high-rise developments and transit expansions to municipal upgrades and utility infrastructure, our solutions have been trusted to detect ground settlement, control structural deformation, and manage vibration risks. Explore our recent projects to see how real-time monitoring and detailed reporting help keep construction safe, efficient, and on schedule.
Each project demonstrates our commitment to accuracy, compliance, and protecting client investments with detailed, legally defensible reports.
Our Selected Surveying and Monitoring Portfolio
Building Settlement Monitoring for Engineers
Contractor: EXP
Site: New Westminster, BC
Date: July, 2023
Six-month settlement monitoring program on an existing building in New Westminster. Sensors and precise survey methods were used to measure vertical movement over time, providing engineers with clear data to assess building performance, safeguard structural integrity, and support informed decision-making throughout the monitoring period.
Pre & Post Construction Survey in Penticton
Contractor: Stretch Construction
Site: Penticton, BCDate: September, 2024
Comprehensive photographic condition surveys for a project site in Penticton, BC. High-resolution images documented the state of nearby properties before construction began and again after completion, creating a clear record of existing conditions and ensuring accountability for any potential changes or damages.
Pre-Construction Condition Survey in Vancouver
Contractor: Ledingham McAllister
Site: Vancouver, BC
Date: March, 2025
Detailed photographic pre-construction condition survey for a real estate developer in Vancouver, BC. The work included documenting an adjacent mixed-use building as well as all nearby buildings and infrastructure within the project’s zone of influence. This detailed baseline record provided clear evidence of existing conditions, helping safeguard the developer and stakeholders throughout the construction process.
Structural Crack Monitoring for Residential Strata
Client: Bayside Properties
Site: New Westminster, BCDate: July, 2023
Installed and maintained tell-tale gauges at a residential strata complex in New Westminster to track crack movement over time. Regular site visits and data collection provided accurate records of structural changes, helping property managers and engineers assess stability, document conditions, and make informed maintenance decisions.
Video Condition Survey for Heavy Equipment on Roadway
Client: Drake Excavation
Site: Mission, BCDate: September, 2023
Carried out a video condition survey of residential roadways in Mission, BC. The survey was completed ahead of an excavation project where heavy dump trucks were scheduled to travel over local roads. Continuous video documentation created a detailed record of pre-construction conditions, helping protect both the municipality and contractors by providing evidence of any changes throughout the project.
City of Vancouver
Noise By-law Compliance
Client: Horizon Civil
Site: Vancouver, BC
Date: September, 2025
Continuous noise monitoring at a commercial site in Vancouver to ensure compliance with the City’s noise bylaw requirements. Using calibrated sound level meters, our team tracked noise levels throughout construction activities, providing clear reporting and documentation to demonstrate regulatory compliance and minimize community impact.
Commercial Complex Adjacent to Langley SkyTrain
Client: Accurate Security
Site: Langley, BCDate: July, 2025
Documented a two-storey commercial complex in Langley, BC, located adjacent to the new SkyTrain extension. With heavy drilling and piling planned nearby, our photographic condition survey provided a thorough record of the building’s state prior to construction, ensuring accountability and protecting the interests of both the property owner and the project developer.
Vibration Monitoring for Surrey Project
Client: Private Developer
Site: Surrey, BCDate: December, 2024
Three-month vibration monitoring program for a developer in Surrey, BC. Using calibrated sensors placed near sensitive structures, we continuously tracked vibration levels during construction activities. The monitoring ensured compliance with threshold limits, protected adjacent properties, and provided the developer with reliable data and reporting throughout the project.
Frequently Asked Questions from Contractors and Developers
What types of projects does Lil Mount Monitoring typically support?
We work on high-rise developments, transit and rail corridors, utility and infrastructure upgrades, and municipal construction projects. Our monitoring solutions protect adjacent properties, ensure compliance, and provide engineers of record with reliable data throughout construction.
How long does it take to set up monitoring on a project?
Most monitoring systems can be mobilized within a few business days once site access is confirmed. Larger or more complex installations, such as automated total stations or inclinometer chains, may require additional lead time for calibration and baseline data collection.
What monitoring services are usually included in a project?
Depending on the risk profile, projects often combine settlement monitoring, deformation tracking, vibration monitoring, and pre-construction condition surveys. Each case study shows how we matched the right monitoring mix to the site’s specific challenges.
Can monitoring continue for the entire duration of a project?
Yes. Our systems are designed for continuous operation, whether the project lasts weeks or multiple years. Automated alerts and monthly reports ensure that project managers and engineers receive consistent updates until construction is complete.
How do your monitoring reports help project managers and engineers?
Reports include timestamped data, graphical trends, exceedance alerts, and clear summaries. This documentation satisfies regulatory and insurance requirements and provides a defensible record of structural and ground conditions.
Do you also provide pre- and post-construction condition surveys?
Yes. Many of our projects begin with a photographic or video condition survey to document baseline conditions. Post-construction surveys provide a clear before-and-after comparison that reduces disputes with property owners and stakeholders.
Property & Facility Monitoring
Light impact short-term monitoring for strata and facilities. Analyze noise, vibration, air quality clear, high-resolution images and conduct detailed inspections to ensure your project's safety and success. Experience the future of construction with precise 3D modeling and accurate site assessments.